Fortinet black logo

Business Continuity

Copy Link
Copy Doc ID ed540d89-57e0-11e9-81a4-00505692583a:435616
Download PDF

Business Continuity

  • Set up and use High Availability (HA).
  • Ensure there is no power interruption. A power loss could cause the loss of a FortiManager device's database integrity. See Maintain database integrity.
    • Always shut down or reboot the FortiManager gracefully. Removing power without a graceful shutdown might damage FortiManager databases.
    • Ensure the FortiManager environment has a stable and uninterruptible power supply.
  • If an unexpected power loss occurs, revert to a known good backup of the configuration.
  • Ensure there are spare parts on site, such as fans, power supplies, and hard disk drives.

Business Continuity

  • Set up and use High Availability (HA).
  • Ensure there is no power interruption. A power loss could cause the loss of a FortiManager device's database integrity. See Maintain database integrity.
    • Always shut down or reboot the FortiManager gracefully. Removing power without a graceful shutdown might damage FortiManager databases.
    • Ensure the FortiManager environment has a stable and uninterruptible power supply.
  • If an unexpected power loss occurs, revert to a known good backup of the configuration.
  • Ensure there are spare parts on site, such as fans, power supplies, and hard disk drives.