Scheduling reports
You can configure a report to generate on a regular schedule. Schedules can be viewed in the Report Calendar. See Report calendar.
To schedule a report:
- Go to Reports > Report Definitions > All Reports.
- Select a report and click Edit in the toolbar.
- Click Settings in the toolbar.
- Select the Enable Schedule checkbox and configure the schedule.
- Click Apply.